AboutAcademicsAdmissionsAlumni and FriendsAthleticsCampus Life
Home >
Facilities Management > University Facilities Projects > Kaiser Hall Gymnasium & Lobby HVAC Improvements - Code Compliance / Infrastructure Improvements (CSUS 2020)
page tools :

<<  BACK TO PROJECT LIST

Kaiser Hall Gymnasium HVAC Improvements (CSUS 2020)

(Estimated Project Cost: $1,200,000)

 


 

Project Description

This project provides for the installation of a new heating, ventilation and air conditioning (HVAC) system for the University's gymnasium and adjacent facilities.  Constructed in 1965, Kaiser Hall houses the University’s athletic, physical education and recreation departments. The facility was designed without air conditioning or provisions to increase ventilation.  A new air handler will be introduced into the existing Fan Room and will be utilized as the source of heating and cooling.   Installation of new ductwork, air diffusers, drain pans and direct digital temperature controls will be included as part of this project.  The scope of this project will also include the replacement of four air handling units. 

Time-Line

Design TBD   
Bid Opening
TBD
Contract Award
TBD
Start of Construction
TBD
Completion of Construction
TBD
Occupancy n/a








Project Administered by: CCSU

Project Status Report

Project is on hold until sufficient funding is made available.

  


<<  BACK TO PROJECT LIST
© 2013 CENTRAL CONNECTICUT STATE UNIVERSITY  CONTACT US   SITE MAP      WEBMASTER      DIRECTIONS   CAMPUS ACCESSIBILITY
email page print page small type large type large type
powered by finalsite