Henry Barnard Hall Window Replacement (CSUS 2020)
(Estimated Project Cost: $1,750,000)

Project Description
This project provides for the replacement of windows in Henry Barnard Hall which was constructed in 1953.
This project will consist of removing all of the existing single-pane window structures and replacing them with high-efficiency low E rated window structures. In addition to the aesthetic improvements to the building, the new window systems will reduce glare and improve the interior environmental temperature.
Time-Line
| Design |
In progress
|
Bid Opening
|
Spring 2012
|
Contract Award
|
Spring 2012
|
Start of Construction
|
Summer 2012
|
Completion of Construction
|
Fall 2013
|
| Occupancy |
n/a
|
Project Administered by: CCSU
Project Status Report
Project requires commission letter and requires phasing around construction of New Academic Building.