AboutAcademicsAdmissionsAlumni and FriendsAthleticsCampus Life
page tools :

<< BACK TO PROJECT LIST

New Engineering Building (CCSU Funds)

(Estimated Project Cost: $850,000)

 


Rendering may not reflect the final construction.

Project Description

This project provides for the construction of a new approximately 4,300 square foot single-story laboratory building adjacent to Copernicus Hall. The facility will consist of a steel frame structure with prefabricated metal siding with a brick veneer and metal roof. The Engineering Building will provide space for Engineering Laboratories.

Time-Line

Design Complete
Bid Opening
Complete
Contract Award
Complete
Start of Construction
Complete
Completion of Construction
Fall 2011
Occupancy TBD







 


Project Administered by: CCSU

Project Status Report

Project is currently under construction. Occupancy of this building will be in coordination with the School of Engineering in corellation with the interior fit-out of labs. Contractor delays are impacting the completion date of this project.

<< BACK TO PROJECT LIST
© 2013 CENTRAL CONNECTICUT STATE UNIVERSITY  CONTACT US   SITE MAP      WEBMASTER      DIRECTIONS   CAMPUS ACCESSIBILITY
email page print page small type large type large type
powered by finalsite