                  Summer/2006 Projects Announcements

                 Add this page to your Favorites - "Bookmark" it

                       See all CCSU Construction Updates: Construction Updates

                       See the C.C.S.U. Weather Report site:  CCSUWeather

                 Read an article from the New Britain Herald (11/15/2002)about CCSU construction projects

              Read an article from the New Britain Herald (7/21/2003) about the CCSU Center Mall

                   Give Blood. Call the Connecticut Red Cross Blood Program at 860-678-2700.
               Or, consider an Apheresis donation. Call 860-678-2749.  Find out more here.

              Click here for the Center Mall live video cam
 

                ***************************************************************************************************************************

                      Tip of the Week: Safety Notice      Image of a Trash Bag & a Trash Can

            Please do not overload trash containers with heavy books, magazines, pieces of wood
           with nails, broken glass, metal objects, etc.  These items are heavy and sharp and can
              cause injury to the custodial workers.  Also, these trash bags can tear from the overloads,
   and can cause additional work for the custodians and trash haulers.  For heavier or sharp objects,
     please use cartons; if you do not have cartons, ask your building's custodian for them. Or,
       ask for additional trash bags so smaller quantities can be bagged in each case.
       Smaller, lighter loads are safer for everyone. Thank you for your cooperation.


                                                                                              
 - Facilities Management 

               Did you know that the words "silent" and "listen" are spelled with the same letters?
           Coincidence?  We don't think so!

             ***************************************************************************************************************************

  EVENTS

 

Summer 
200
6

 

Image of a Building
"If you build it, they will come"

construction progress graph

Construction Progress Graph




                           

Mon.
June 26
 

Image of a Construction "Sawhorse" Barricade

     
Image of Brick Mason Laying Bricks


 

 

 GENERAL ANNOUNCEMENTS

 
bullet

Barnard Hall - effective immediately, and until further notice, the NORTHEAST ENTRANCE/EXIT STAIRWAY facing the new Welte Parking Garage, IS CLOSED; access to the Barnard Hall is available via the south and west entrances, as well as the "loading dock" entrance

bullet

Copernicus Parking Garage - the former east Wells Street entrance to this parking garage will remain closed  permanently. Access to parking in this facility will remain via the Manafort Drive entrances only. Wells Street is to be used for access to the North residence quad parking lot, the Energy Center, and East Hall. 

bullet

Vance Residence Hall- this residence hall will be  closed for renovation during the Summer/2006 , and will reopen for the Fall/2006 semester.

bullet

MAJOR NEW OR RENOVATION PROJECTS RECENTLY COMPLETED or underway: Energy Center; Campus Center Mall; Copernicus Hall; Welte Parking Garage; Student Center; Sheridan Hall; Kaiser addition; Vance Academic Center; Arute Stadium;  Memorial Hall; Kaiser roof; and the Early Learning Center; renovation of the overhead door area in Copernicus, office renovations in Barnard Hall  and Marcus White Hall; replacement of the Detrick Gym floor; renovation of Gallaudet Hall; replacement of sprinkler heads in Vance Academic Center; and the refinishing of corridor floors in Marcus White.  PROJECTS UNDERWAY:   the renovation of the west and northeast entrance/exit areas of Barnard Hal;  renovation of offices in Davidson, replacement of the Kaiser Annex Bubble; asbestos abatement and renovation of Vance Residence Hall; directional sidewalk banners; water damage repairs to Barrows Hall; new CCSU signs on Stanley Street;  installation of A/C in selected classrooms; and campus landscaping.  

------------------------------------------------------------------------------------------
bullet

New CCSU directional banners have been installed on light poles around the campus to better direct pedestrians to various offices, departments, and facilities. Since the project is on-going, we would appreciate any feedback on placements and directional bearing of these banners.  Please provide your comments and suggestions to bottonej@ccsu.edu

bullet

Vance Residence Hall - CLOSED. Renovation underway on all floors. All individual room furnishings have been dismantled and removed in preparation for this project.  Additional furnishings will be removed from the basement level this week. The building will not be accessible for any foot traffic, and will remain closed off for the duration of the project. The residence hall will reopen for the Fall/2006 semester.

bullet

Barrows Hall - work continues on repairing damage caused by water leaks and moisture. Area will remain fenced for the duration of the project in order to protect pedestrian traffic.  The building will remain open via the main entrance on the west side. 

bullet

Vance Residence Hall - during the day today and tomorrow (June 5 & 6), all surplus furniture will be removed from the basement storage area and either disposed of or redistributed accordingly.

bullet

Vance Academic Center - the project to replace all of the fire sprinkler heads in the building has been completed. Another successful project by Facilities Management to enhance the campus' safe environment.  This project will be repeated in Welte Hall the week of August 7-11; additional information will be forthcoming as it becomes available.

bullet

 

Tues. June 27
 


Image of a Construction "Sawhorse"  Barricade

 

 

Image of Technician Installing Air Conditioning

 

-------------------------------------------------------------------------------------
bullet

Burritt Library - the MAIN entrance to the library is temporarily closed - including both the upper and lower entrances. Due to the recent heavy rain, the roof support covering the main entrance has weakened necessitating this closure.  The library remains open, and access is available via the rear (north) entrances.  Follow-up information will be provided as soon as a structural engineer has reviewed the situation and makes appropriate recommendations

bullet

Burritt Library -effective immediately, the ground level exits (facing the Student Center) will be closed. During this time please use the rear entrance to the building for access to the ground floor. One of the exterior stairways to the second floor will be available during the construction. Signage will be provided inside the library indicating which exits will be closed. Weather permitting, this project should be completed around March 1st.

bullet

bullet

Alumni Affairs Office - the Alumni Affairs Office has relocated temporarily  to RVAC 011 (the old Banner Room) while repairs are being performed in its regular office spaces.  It is expected that the repairs will take approximately one month.  Telephone: 860-832-1740 and eMail: alumnidept@ccsu.edu

bullet

Barnard Hall - modifications to Classrooms 262, 318, 319, and 349 are being performed to install window air conditioning units. This work is expected to be completed by the first week of July.

bullet

 


Wed. June 28

 



 

----------------------------------------------------------------------------------

bullet

Barnard Hall - demolition and renovation work continues on the northeast exterior stairway. This stairway has been closed, and this project will create eliminate the stairs, with a new ground-level entrance/exit, and eliminate the main level doors.

--------------------------------------------------------------------------------------

Thur. June 29
Image of Smokestack

          The Man ComesAround
                              Ω

 

bullet

Power House - the project for the demolition the 100' high smokestack on the historic Power House building has begun. Portions of the top of the smokestack have been removed, and work will continue on the remainder.  Daily progress can be witnessed on this demolition project.

bullet

First Five Weeks Summer Session ends today.

          

   

---------------------------------------------------------------------------------------

Fri. June 30

Image of a Construction "Sawhorse" Barricade
Image of a Fox
A fox is a sly and clever animal

bullet

Burritt Library - the MAIN entrance to the library is temporarily closed - including both the upper and lower entrances. Due to water damage, the roof support covering the main entrance has weakened necessitating this closure. The library remains open, and access is available via the rear [north] entrances. Follow-up information will be provided as soon as a structural engineer has reviewed the situation and makes appropriate recommendations.

   


Sat. July 1
 
 
           
            

 

---------------------------------------------------------------------------------------

bullet

Have a nice weekend!

         


Sun. July 2

 1776 - 2006
230 years of freedom and independence.
Celebrate Independence Day
Tuesday July 4




 

 

Image of Directional Arrow Pointing Right

Upcoming Projects
and Events


Image of Construction Worker Reading Blueprints
Updates on these and other upcoming
projects will be forthcoming as
additional information is received



IMPORTANT
ASBESTOS
NOTICE

          
Image of Technician Testing Air Quality
Click on this image to
find more information
on asbestos abatement

---------------------------------------------------------------------------------------

bullet

Second Five Weeks Summer Session begins tomorrow - Monday July 3 (no classes on Tuesday
July 4 in observance of Independence Day)

                     Image of an Fireworks and an American Flag   Image of an American Flag     Image of Fireworks and an American Flag
      

----------------------------------------------------------------------------------------  

bullet

Barnard Hall - completion of the project to eliminate the exterior stairway at the northeast corner of the building; will include removal of the stairway & landings, elimination of the entrance/exit at the 1st floor level, and installation of new doors for the new entrance/exit at the lower level.

bullet

Welte Hall - a project is being planned to replace the fire suppression system sprinkler heads in Welte Hall during the week of Monday-Friday August 7 - 11.  Coordination is being developed with the affected departments which occupy the building. More information will be forthcoming as the project dates approach.  A similar project was recently successfully completed in  the Vance Academic Center. 

bullet

 Second Five Weeks Summer Session begins Monday July 3 (no classes on Tuesday
 
July 4 in observation of Independence Day).

-------------------------------------------------------------------------------------------

************IMPORTANT - PLEASE READ************

In general, it should be noted that for safety purposes, asbestos abatement is performed by licensed and experienced contractors in a contained environment,  conducted in accordance with state departments of Health and Environmental Protection requirements, and supervised by the Department of Public Works. Negative air pressure, which allows particle material in but not to escape out, is  used to provide maximum protection. The abatement process is  monitored by an independent licensed Industrial Hygienist who performs air quality monitoring tests. These tests are performed before, during, and after the abatement process. Containment will be continued until clean air sampling has been achieved and the Industrial Hygienist allows the space to be reopened.  These procedures are utilized on all abatement projects on the  campus, and personal health and safety are the main priorities emphasized throughout the entire process, in addition to the complete removal of all the asbestos materials.               
                                                           
 

                 

                                  Click here for:           CCSU Inventory Policies & Procedures         CCSU Weather           


                        ADMINISTRATIVE AFFAIRS HOME | FORMS | ATHLETICS | FACILITIES MANAGEMENT  POLICE

                      
CAMPUS MAP
| PROJECT UPDATE | DIRECTORY |
CCSU HOME I MAIL SERVICES   

                        INVENTORY POLICIES

CCSU Logo

Copyright © 2003 [Central Connecticut State University]. All rights reserved.

Last Updated: Friday June 30, 2006
webmaster: bottonej@ccsu.edu

Hit Counter